Monday, 13 February 2012

New cloakroom

Here we converted an understairs cupboard which used to house the washing machine and tumble dryer into a modern downstairs cloakroom.


Thursday, 12 January 2012

A little Ensuite

Finished this little ensuite for a client a few weeks ago. 
The slate to the right of the sink/behind the toilet was a right tricky product to install, but certainly makes a feature of the wall.

Friday, 2 December 2011

Garage Conversion

Just completed this garage conversion. The client wants it as a playroom for their 2 kids. Flooring is Quickstep laminate in White Ash.

Monday, 21 November 2011

Bathroom Refurbishment

Here we carried out a full bathroom refurbishment with new bathroom suite and shower enclosure.  A new radiator was fitted replacing the old towel rail. The floor was tiled with square ceramic tiles and the walls are a porcelain tile with a granite/glass mosaic border.




Wednesday, 7 September 2011

Laminate Flooring

Here we installed an Oak laminate floor into a newly built conservatory. The flooring used was Quick-Step Classic in Natural Varnished Oak.

Monday, 22 August 2011

Indian Sandstone Patio

After
Before 
This job was to replace an old 1970's concrete slab patio with a new Indian Sandstone one. The old paving was removed and disposed of. The lower patio area was built up with a crushed limestone base. The brick pavior edging was installed along with the Indian Sandstone paving. A new timber arbour was also constructed and new trellis installed to disguise the existing panel fencing. The old brick was also rendered to improve the appearance. Above are before and after photos and below are some additional photos of the completed job. 


Tuesday, 2 August 2011

Decking

Here we installed a small decking area surrounding an existing hot tub.