Friday, 1 June 2012

Oak Wood Flooring

Here we installed Solid Oak wood flooring to a hallway. The old vinyl floor tiles were removed along with the old skirting. The new random length wood flooring was glued to the subfloor with Sikabond AT-80 flooring glue and then new skirting installed.

After
Before

Wednesday, 23 May 2012

Another new bathroom

Another bathroom was finished last week. Flooring is filled & honed Travertine and the walls are a travertine look ceramic. Fixtures and fittings are Cooke & Lewis from B&Q.




Wednesday, 4 April 2012

New Bathroom

Here we totally gutted the old bathroom back to the bare walls.  We then replaced the whole suite, installed a proper shower and tiled the floor & walls.

After
Before


After
Before

Thursday, 15 March 2012

A tiny en-suite

Just finished this en-suite. The old one was a totally hideous 1970's monstrosity, it had to be totally ripped out (including the walls) and rebuilt from scratch. The space is only 76cm wide by 260cm long and all perfectly usable.

Thursday, 8 March 2012

Car Port

Here's a nice little car port that we've been constructing over the last couple of days. Timber framework with a twinwall polycarbonate roof.


Monday, 13 February 2012

New cloakroom

Here we converted an understairs cupboard which used to house the washing machine and tumble dryer into a modern downstairs cloakroom.


Thursday, 12 January 2012

A little Ensuite

Finished this little ensuite for a client a few weeks ago. 
The slate to the right of the sink/behind the toilet was a right tricky product to install, but certainly makes a feature of the wall.