Friday, 14 December 2012

Ensuite 3 of 3

This was the 1st of 3 bathrooms to be refitted in this house. So we ripped out the old, removed all the old tiles and then re-skimmed the whole room. We tiled the floor and then the new shower, basin and WC were installed. The bathroom furniture is supplied by Island Bathrooms and the tiles are from Dunkley Tiles.


Friday, 30 November 2012

Bathroom 2 of 3

This was the 2nd of 3 bathrooms to be refitted in this house. So we ripped out the old, removed all the old tiles and then re-skimmed the whole room. A Karndean equivalent flooring was installed and then the new bath, basin unit, WC unit and worktop were installed. The bathroom furniture is supplied by Island Bathrooms and the tiles are from Dunkley Tiles.

Friday, 23 November 2012

Ensuite 1 of 3

This was the 1st of 3 bathrooms to be refitted in this house. So we ripped out the old, removed all the old tiles and then re-skimmed the whole room. A Karndean equivalent flooring was installed and then the new shower, basin and WC were installed. The bathroom furniture is supplied by Island Bathrooms and the tiles are from Dunkley Tiles.


Friday, 16 November 2012

Bathroom refurbishment

Once again another total bathroom refurbishment. Suite supplied by B&Q. Tiles supplied by Tile Giant.


Friday, 26 October 2012

Another kitchen

This was a total kitchen replacement. It was ripped out to a bare room, new vinyl floor laid and then the new units installed. The splashbacks were then tiled. Kitchen supplied by Howdens. Tiles from Topps tiles.


Saturday, 29 September 2012

Recent bathroom

This bathroom involved removing the old corner bath suite, replacing some of the tiles which were either holed or missing and then installing new WC, bath and basin unit. All blended in so seamlessly that you can't see the changes made.


Friday, 24 August 2012

New Kitchen

This kitchen involved a total rip out, then knocking through a non-supporting wall between the kitchen and dining area to allow for a large breakfast bar area. The kitchen was supplied by Wren with solid oak worktops coming from a specialist worktop supplier. The flooring is a travertine effect laminate from Howdens.


Friday, 10 August 2012

Staircase

On this project we upgraded an existing staircase from an old 1970's style to a more modern White Oak spindles style. The spindles, newel posts and handrail is from the Richard Burbidge Trademark Slender range.


Friday, 6 July 2012

Latest Bathroom

For the past 2 weeks we have been carrying out this bathroom refurbishment. Originally it was 2 rooms, a separate WC and bathroom with basin. We removed the non-load bearing wall between the 2 rooms, then slightly extended the room into the hallway and rebuilt the doorway & stud wall. The ceiling was overboarded and skimmed along with the new stud wall.
The furniture and suite was then installed. The room was then fully tiled. The flooring is Karndean and was installed by an approved fitter.

Tiles supplied by Tims Tiles @ Tower Park, Poole
Bathroom furniture & suite supplied by Island Bathrooms in Bournemouth









Wednesday, 20 June 2012

Laminate flooring in conservatory

Here we removed the old carpet, skirting and brown window boards. The subfloor was chipboard. The client wanted underfloor heating installed so we put Depron Insulation boards first and then the foil based underfloor heating elements. This was then covered with a vapour barrier, we then installed Quickstep Eligna Wengé passionata laminate flooring. A sunken doormat was installed with Quickstep Incizo edging around it. New white skirting and window board was then also installed.



Friday, 8 June 2012

Oak Wood Flooring & Doors

Here we installed new Solid Oak Wood flooring over existing wooden floorboards to a lounge and kitchen/diner. The Oak flooring was fixed down using tongue-tite screws. New skirting was then installed afterwards.



After installing the floor we installed new Oak doors too.



Friday, 1 June 2012

Oak Wood Flooring

Here we installed Solid Oak wood flooring to a hallway. The old vinyl floor tiles were removed along with the old skirting. The new random length wood flooring was glued to the subfloor with Sikabond AT-80 flooring glue and then new skirting installed.

After
Before

Wednesday, 23 May 2012

Another new bathroom

Another bathroom was finished last week. Flooring is filled & honed Travertine and the walls are a travertine look ceramic. Fixtures and fittings are Cooke & Lewis from B&Q.




Wednesday, 4 April 2012

New Bathroom

Here we totally gutted the old bathroom back to the bare walls.  We then replaced the whole suite, installed a proper shower and tiled the floor & walls.

After
Before


After
Before

Thursday, 15 March 2012

A tiny en-suite

Just finished this en-suite. The old one was a totally hideous 1970's monstrosity, it had to be totally ripped out (including the walls) and rebuilt from scratch. The space is only 76cm wide by 260cm long and all perfectly usable.

Thursday, 8 March 2012

Car Port

Here's a nice little car port that we've been constructing over the last couple of days. Timber framework with a twinwall polycarbonate roof.


Monday, 13 February 2012

New cloakroom

Here we converted an understairs cupboard which used to house the washing machine and tumble dryer into a modern downstairs cloakroom.


Thursday, 12 January 2012

A little Ensuite

Finished this little ensuite for a client a few weeks ago. 
The slate to the right of the sink/behind the toilet was a right tricky product to install, but certainly makes a feature of the wall.