For the past 2 weeks we have been carrying out this bathroom refurbishment. Originally it was 2 rooms, a separate WC and bathroom with basin. We removed the non-load bearing wall between the 2 rooms, then slightly extended the room into the hallway and rebuilt the doorway & stud wall. The ceiling was overboarded and skimmed along with the new stud wall.
The furniture and suite was then installed. The room was then fully tiled. The flooring is Karndean and was installed by an approved fitter.
Tiles supplied by Tims Tiles @ Tower Park, Poole
Bathroom furniture & suite supplied by Island Bathrooms in Bournemouth
No comments:
Post a Comment