Friday, 23 November 2012

Ensuite 1 of 3

This was the 1st of 3 bathrooms to be refitted in this house. So we ripped out the old, removed all the old tiles and then re-skimmed the whole room. A Karndean equivalent flooring was installed and then the new shower, basin and WC were installed. The bathroom furniture is supplied by Island Bathrooms and the tiles are from Dunkley Tiles.


Friday, 16 November 2012

Bathroom refurbishment

Once again another total bathroom refurbishment. Suite supplied by B&Q. Tiles supplied by Tile Giant.


Friday, 26 October 2012

Another kitchen

This was a total kitchen replacement. It was ripped out to a bare room, new vinyl floor laid and then the new units installed. The splashbacks were then tiled. Kitchen supplied by Howdens. Tiles from Topps tiles.


Saturday, 29 September 2012

Recent bathroom

This bathroom involved removing the old corner bath suite, replacing some of the tiles which were either holed or missing and then installing new WC, bath and basin unit. All blended in so seamlessly that you can't see the changes made.


Friday, 24 August 2012

New Kitchen

This kitchen involved a total rip out, then knocking through a non-supporting wall between the kitchen and dining area to allow for a large breakfast bar area. The kitchen was supplied by Wren with solid oak worktops coming from a specialist worktop supplier. The flooring is a travertine effect laminate from Howdens.


Friday, 10 August 2012

Staircase

On this project we upgraded an existing staircase from an old 1970's style to a more modern White Oak spindles style. The spindles, newel posts and handrail is from the Richard Burbidge Trademark Slender range.


Friday, 6 July 2012

Latest Bathroom

For the past 2 weeks we have been carrying out this bathroom refurbishment. Originally it was 2 rooms, a separate WC and bathroom with basin. We removed the non-load bearing wall between the 2 rooms, then slightly extended the room into the hallway and rebuilt the doorway & stud wall. The ceiling was overboarded and skimmed along with the new stud wall.
The furniture and suite was then installed. The room was then fully tiled. The flooring is Karndean and was installed by an approved fitter.

Tiles supplied by Tims Tiles @ Tower Park, Poole
Bathroom furniture & suite supplied by Island Bathrooms in Bournemouth